Practical Schedule Risk Analysis

Jezik NjemačkiNjemački
Knjiga Meki uvez
Nakladnici Taylor & Francis Ltd, lipanj 2024
Project scheduling is required for good project management, and the schedule represents the project... Cijeli opis
? points 139 b
57.61
50 % šanse Pretražit ćemo cijeli svijet Kada ću dobiti knjigu?

30 dana za povrat kupljenih proizvoda


Kupci su kupili i


How to Strengthen Your Walk with God Barbara Ann King / Knjiga Meki uvez
common.buy 14.27
5 Seras Gabriel Briggs / Knjiga Meki uvez
common.buy 12.14
Legacy - Dawn Rukis / Knjiga Meki uvez
common.buy 20.34
Studio SOS Book Paul White / E-knjiga Adobe ePub DRM
common.buy 53.46
Big Fix Rob Childs / E-knjiga Adobe ePub DRM
common.buy 9.41

Project scheduling is required for good project management, and the schedule represents the project plan under a specific set of assumptions, often that it will avoid new risks or even those that have occurred on previous occasions. The typical Critical Path Method (CPM) schedule assumes that the project team knows how long the scheduled activities will take. Yet, the experienced project manager knows that duration values so precisely stated are actually only estimates based on assumptions that could be wrong. A schedule risk analysis explores the implications for the project''s schedule of risk to the activity durations and also identifies the most important schedule risks. This analysis, building on and extending CPM scheduling, will result in a more accurate estimate of completion and provide an early opportunity for planning effective risk mitigation actions. Practical Schedule Risk Analysis contains a complete treatment of schedule risk analysis from basic to advanced concepts. The methods are introduced at the simplest level: * Why is the duration uncertain? * And how do we represent this uncertainty with a probability distribution? These are then progressively elaborated: * How does uncertainty of activities along a path lead to more uncertainty of the path''s completion date? * How can a schedule with parallel paths be riskier than each of the paths individually? * How can we represent risks about activities that are not in the schedule at all? Culminating in a discussion of the most powerful and advanced capabilities available in current commercial software. Schedule risk analysis is a process that is industry-independent, and the methods explained in this volume have been used by the author with positive effect in such industries as construction, oil and gas, information systems, environmental restoration and aerospace/defense. The result is a book that is not only highly practical; something that people within all types of projects and in all industries can apply themselves; but that is an extraordinarily complete guide to creating and managing a rigorous project schedule.

Glumica & Poliglotkinja
EWA KASP za
Pusti video
Ewa Kasp
Libristo ima najveći izbor literature na stranim jezicima. Zato svoje knjige kupujem ovdje.

Moglo bi vas zanimati i


Die Rechtsbehelfe im Verwaltungsvollstreckungsverfahren. Hans-Dietrich Traulsen / Knjiga Meki uvez
common.buy 66.01

Prijava

Prijavite se na svoj račun. Još nemate Libristo račun? Otvorite ga odmah!

 
obvezno
obvezno

Nemate račun? Ostvarite pogodnosti uz Libristo račun!

Sve ćete imati pod kontrolom uz Libristo račun.

Otvoriti Libristo račun
Književni savjetnik Libroamiko
Dobar dan, ja sam Libroamiko, mogu li vam pomoći?